#{{srno}}{{('/' + prno) if prno }}
Hudayriyat Floating Bridge Piling Work
- Theme
- Enabling Works / Piling / Ground Improvement
- Client
- MODON
- Country
- UAE
- Status
- Completed
Scope of Work
The scope of work covers the installation of the Piles, Pile Bracings and Testing for the Mussafah channel crossing floating bridge, access from Hudayriyat Island to Musaffah.
A total of 7 piles (Mooring Piles – 3 No's, Pivot Piles – 3 No's & Parking Piles – 1 No's) 1375 mm OD have been installed.
Total piles driven : 7 No's
PDA Testing : 2 No's