Guaranteeing
Safety At Work

NMDC Group fosters a culture of unwavering responsibility towards our employees, assets, and environment. We continually strive to improve HSE performance, ensuring every member of staff feels confident and reassured while carrying out their duties. Through the implementation of stringent health and safety policies and procedures, we are safeguarding our people, raising industry benchmarks, and cultivating a safer workplace for all.

Health and Safety
and NMDC Group

At NMDC Group, the safety of our employees and sub-contractors is of paramount importance.

We have a dedicated Quality, Health, Safety and Environment (QHSE) department whose aim it is to create a strong health and safety culture within the business, and ensure our QHSE performance. As a result, we have developed an exceptional reputation over the years for our commitments to cause, and earned a number of industry renowned awards.

  • Policies And Procedures

    NMDC Group is routinely charged with executing some of the region’s most ambitious engineering and construction projects, and we take our responsibilities to health, safety and the environment extremely seriously. Our proactive approach to health and safety ensures we are continually taking steps to protect our employees. This includes the provision of standard operating procedures, detailed site work instructions, and conducting rigorous risk and environmental impact assessments. We also hold regular talks and workshops with employees to ensure team members fully understand their roles and responsibilities with regards to safety.
  • HSE Manual

    We place great importance on how we communicate our HSE policies. The NMDC Group HSE manual serves as a reference point for employees and sub-contractors, as well as a reflection of our commitment to worker wellbeing. This comprehensive document sets down our policies and procedures in comprehensive detail, ensuring everyone is equipped, informed, and ready to work safely.
  • HSE Training

    Key to our HSE strategy is ensuring all our employees have the necessary skills and competencies to work safely. We assess training needs on an annual basis, and provide supplementary training as required to ensure all our people are meeting the highest standards of HSE performance. During onboarding, new starters must go through a HSE Induction Training Program, to ensure everyone at NMDC Group understands their responsibilities towards their own safety, and the safety of those around them.

Our Projects

From offshore wind power development and maintenance projects to the creation of sustainable urban infrastructure, NMDC Group puts responsibility at the heart of all our operations. To find out more about how we work to accelerate change and invest in the future, explore our projects.

  • ADOC - 18” Pipeline Remedial Project

    • NMDC Energy
    • ADNOC
    Theme
    Offshore
    Client
    ADNOC
    Country
    UAE
    Status
    Completed, 2021 to 2023
    Read More 27
  • Al Shaheen Development Project 2005 GA Wellhead Module, ED, GD & GB Platforms

    • NMDC Energy
    • Maersk Oil Qatar
    Theme
    Offshore
    Client
    Maersk Oil Qatar
    Country
    Qatar
    Status
    Completed, 2007 to 2010
    Read More 45
  • Al Shaheen Development Project - Package No.2

    • NMDC Energy
    • Maersk Oil Qatar
    Theme
    Offshore
    Client
    Maersk Oil Qatar
    Country
    Qatar
    Status
    Completed, 1997 to 1998
    Read More 47
  • B Series and N-15 & N-16 Well Platforms Project

    • NMDC Energy
    • ONGC
    Theme
    Offshore
    Client
    ONGC
    Country
    India
    Status
    Completed, 2010 to 2012
    Read More 44
  • C-Series Project

    • NMDC Energy
    • ONGC
    Theme
    Offshore
    Client
    ONGC
    Country
    India
    Status
    Completed, 2006 to 2009
    Read More 46
  • Charter of DLS-4200 (2nd campaign - Addl. Work in 2022)- T&I of Monopiles at Yunlin Wind Farm,Taiwan

    • NMDC Energy
    • Yunneng Wind Power Co
    Theme
    Renewable energy
    Client
    Yunneng Wind Power Co
    Country
    Taiwan
    Status
    Ongoing
    Read More 16
  • Charter of DLS-4200 for Offshore Instl'n of Monopiles - Additional Works @ Musaffah

    • NMDC Energy
    • Yunneng Wind Power Co
    Theme
    Renewable energy
    Client
    Yunneng Wind Power Co
    Country
    UAE
    Status
    Completed, 2022
    Read More 29
  • Charter of DLS-4200 for Offshore Instl'n of Monopiles - Year 2023 Campaign

    • NMDC Energy
    • Yunneng Wind Power Co
    Theme
    Renewable energy
    Client
    Yunneng Wind Power Co
    Country
    Taiwan
    Status
    Ongoing
    Read More 15
  • Charter of DLS-4200 for Offshore Instl'n of Monopiles

    • NMDC Energy
    • Yunneng Wind Power Co
    Theme
    Renewable energy
    Client
    Yunneng Wind Power Co
    Country
    Taiwan
    Status
    Completed, 2022
    Read More 30
  • Replacement of Zulf Trunkline

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 8
  • Upgrade AM Crude Platforms - Zulf Pkg. 3

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 4
  • Upgrade AM Crude Platforms - Zuluf Pkg.4 Subsea Cables

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 5
  • Ju’aymah Offshore Platform – Bypass System

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 24
  • LTA For Zulf AH West Oil Facilities (Pkg 4)

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 20
  • LTA For Zulf AH East Oil Facilities (Pkg 5)

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 21
  • LTA For Jafurah Development Program - Condensate Terminal

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 17
  • LTA for 14 Jackets - Manifa Field

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Ongoing
    Read More 18
  • Dalma Gas Development Project - Pkg. A - Offshore

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 22
  • EPC for Bab Thammama "G" and Habshan

    • NMDC Energy
    • ADCO
    Theme
    Onshore
    Client
    ADCO
    Country
    UAE
    Status
    Completed, 2010 to 2013
    Read More 41
  • EPC For Belbazam Block Development Project

    • NMDC Energy
    • Al Yasat
    Theme
    Onshore
    Client
    Al Yasat
    Country
    UAE
    Status
    Ongoing
    Read More 23
  • EPC For Hail & Ghasha Development Project

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Onshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 6
  • EPC for Qusahwira Field Development

    • NMDC Energy
    • ADCO
    Theme
    Onshore
    Client
    ADCO
    Country
    UAE
    Status
    Completed, 2010 to 2013
    Read More 42
  • EPC of LZ Habshan Upper Recovery & Lekhwair + 20 MBD Project (HURLK)

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 3
  • EPCIC Works for 20" MOL from UMM LULU to Zirku Island Project

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 10
  • Estidama - EPC Pkg. 3 - New Pipeline Network (56")

    • NMDC Energy
    • ADNOC
    Theme
    Onshore
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 11
  • LTA - EPC of Eight (8) Nos. Jackets @ BERRI - OOK / IK

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2016 to 2018
    Read More 48
  • LTA - EPC of Nine (9) Nos. Jackets

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2016 to 2018
    Read More 39
  • LTA for Eight (8) Slipover Platforms with Associated P/Ls & Cables

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2018 to 2021
    Read More 32
  • LTA For Nine (9) Jackets @ MRJN Field.

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2018 to 2021
    Read More 35
  • LTA for Safaniya Slipover (4 Nos) with Associated P/Ls & Cables - OOK / IK

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2018 to 2021
    Read More 33
  • LTA For Ten (10) Jackets @ MRJN, SFNY, Abu Safah Fields - OOK / IK

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2018 to 2021
    Read More 34
  • LTA for TP-21 Platform & P/Ls - OOK / IK

    • NMDC Energy
    • Saudi Aramco
    Theme
    Offshore, Onshore
    Client
    Saudi Aramco
    Country
    Saudi Arabia
    Status
    Completed, 2017 to 2021
    Read More 31
  • LZ - 3 Water Injection (WI) Pipelines & Associated Fac.

    • NMDC Energy
    • ADNOC
    Theme
    Offshore
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 12
  • LZ Long Term Dev. Ph .1 (LZ LTDP-1) -NMGL

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 14
  • LZ LTDP-1 EPS-2 & PDP

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 2
  • MERAM (Maximizing Ethane Recovery & Monetization Project)

    • NMDC Energy
    • ADNOC Gas
    Theme
    Onshore
    Client
    ADNOC Gas
    Country
    UAE
    Status
    Ongoing
    Read More 9
  • Nasr Full Field Development Project - Pkg-1 + 85 MBD Modification

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Completed, 2014 to 2023
    Read More 28
  • مشروع تطوير مجموعة WO-16 وSB-14 WHP (5 أعداد) التابعة لشركة ONGC

    • NMDC Energy
    • ONGC
    Theme
    Offshore
    Client
    ONGC
    Country
    India
    Status
    Completed, 2011 to 2013
    Read More 43
  • R Series - 5 Nos WHPS & Pipelines Project

    • NMDC Energy
    • ONGC
    Theme
    Offshore
    Client
    ONGC
    Country
    India
    Status
    Completed, 2018 to 2019
    Read More 38
  • Replacement of TB-3 Mooring System (Anchor Piles & Chanis)

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 7
  • Satah Full Field Development (Offshore Part)

    • NMDC Energy
    • ZADCO
    Theme
    Offshore, Onshore
    Client
    ZADCO
    Country
    UAE
    Status
    Completed, 2011 to 2017
    Read More 40
  • Skyborn (WPD) / Yunneng - Charter of DLS-4200 ( for 2024 Campaign) - T&I Work for Yunlin Wind Farm,Taiwan

    • NMDC Energy
    • Skyborn Renewables GmbH (WPD)
    Theme
    Renewable energy
    Client
    Skyborn Renewables GmbH (WPD)
    Country
    Taiwan
    Status
    Ongoing
    Read More 1
  • Umm Al Dalkh Early Production Scheme Project (EPC)

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Completed, 2021
    Read More 26
  • Umm Lulu Full Field Development Project (Pkg-1)

    • NMDC Energy
    • ADMA OPCO
    Theme
    Offshore
    Client
    ADMA OPCO
    Country
    UAE
    Status
    Completed, 2021
    Read More 25
  • Umm Lulu Full Field Development Project (Pkg-2)

    • NMDC Energy
    • ADMA OPCO
    Theme
    Offshore
    Client
    ADMA OPCO
    Country
    UAE
    Status
    Completed, 2013 to 2020
    Read More 36
  • US LTDP Phase-1

    • NMDC Energy
    • ADNOC Offshore
    Theme
    Offshore
    Client
    ADNOC Offshore
    Country
    UAE
    Status
    Ongoing
    Read More 19
  • UZ-750 - EPC 1 (P/Ls, Cables, Riser Platforms)

    • NMDC Energy
    • ZADCO
    Theme
    Offshore
    Client
    ZADCO
    Country
    UAE
    Status
    Completed, 2012 to 2020
    Read More 37
  • Al Bateen Marina

    • NMDC Dredging & Marine
    • Crown Prince Court
    Theme
    Seaborne Trade
    Client
    Crown Prince Court
    Country
    UAE
    Status
    Completed, 2010 to 2011
    Read More 22
  • Al Gurm Resorts

    • NMDC Dredging & Marine
    • Aldar
    Theme
    Urban Development
    Client
    Aldar
    Country
    UAE
    Status
    Completed, 2006 to 2007
    Read More 12
  • Al Maryah Island Infrastructural Project

    • NMDC Dredging & Marine
    • Mubadala
    Theme
    Urban Development
    Client
    Mubadala
    Country
    UAE
    Status
    Completed, 2008 to 2010
    Read More 18
  • Aykon Resorts At Bolidhuffaru Lagoon

    • NMDC Dredging & Marine
    • Vita Heights Company Limited (Subsidiary of DAMAC)
    Theme
    Tourism
    Client
    Vita Heights Company Limited (Subsidiary of DAMAC)
    Country
    Maldives
    Status
    Completed, 2017
    Read More 11
  • Barakah NPP Marine Works

    • NMDC Dredging & Marine
    • KEPCO
    Theme
    Energy
    Client
    KEPCO
    Country
    UAE
    Status
    Completed, 2011 to 2016
    Read More 4
  • Carbon Black & Delayed Coker

    • NMDC Dredging & Marine
    • Takreer
    Theme
    Energy
    Client
    Takreer
    Country
    UAE
    Status
    Completed, 2010
    Read More 27
  • Corniche Beach

    • NMDC Dredging & Marine
    • Abu Dhabi Municipality
    Theme
    Tourism
    Client
    Abu Dhabi Municipality
    Country
    UAE
    Status
    Completed, 2012
    Read More 10
  • Das Island Reclamation Project

    • NMDC Dredging & Marine
    • ADNOC
    Theme
    Seaborne Trade
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 20
  • Capital Dredging Maintanence Dredging, Jebel Ali Port, Dubai Port DPWorld

    • NMDC Dredging & Marine
    • DP World
    Theme
    Seaborne Trade
    Client
    DP World
    Country
    UAE
    Status
    Completed, 2012
    Read More 24
  • East Sitra Housing Project

    • NMDC Dredging & Marine
    • Ministry Of Housing BH
    Theme
    Urban Development
    Client
    Ministry Of Housing BH
    Country
    Bahrain
    Status
    Ongoing
    Read More 7
  • Fujairah Port VLCC

    • NMDC Dredging & Marine
    • Port Of Fujairah
    Theme
    Seaborne Trade
    Client
    Port Of Fujairah
    Country
    UAE
    Status
    Completed, 2008 to 2010
    Read More 15
  • Gasco Sulphur Channel

    • NMDC Dredging & Marine
    • GASCO
    Theme
    Seaborne Trade
    Client
    GASCO
    Country
    UAE
    Status
    Completed, 2010 to 2013
    Read More 25
  • Ghasha Concession Artificial Islands

    • NMDC Dredging & Marine
    • ADNOC
    Theme
    Energy
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 1
  • Habitat Island Project

    • NMDC Dredging & Marine
    • Urban Planning Council
    Theme
    Environment
    Client
    Urban Planning Council
    Country
    UAE
    Status
    Completed, 2009
    Read More 14
  • Khalifa Port Expansion - Marine Works

    • NMDC Dredging & Marine
    • Abu Dhabi Ports
    Theme
    Seaborne Trade
    Client
    Abu Dhabi Ports
    Country
    UAE
    Status
    Completed, 2016 to 2018
    Read More 5
  • Khalifa Port South Quaywall Works

    • NMDC Dredging & Marine
    • Abu Dhabi Ports
    Theme
    Seaborne Trade
    Client
    Abu Dhabi Ports
    Country
    UAE
    Status
    Completed, 2019
    Read More 6
  • Mangroves Abu Dhabi

    • NMDC Dredging & Marine
    • UAE Presidential Court
    Theme
    Environment
    Client
    UAE Presidential Court
    Country
    UAE
    Status
    Ongoing
    Read More 13
  • Mussafah Channel Project

    • NMDC Dredging & Marine
    • Abu Dhabi Urban Planning Council
    Theme
    Seaborne Trade
    Client
    Abu Dhabi Urban Planning Council
    Country
    UAE
    Status
    Completed, 2008 to 2011
    Read More 9
  • Nareel Island Project

    • NMDC Dredging & Marine
    • Aldar
    Theme
    Tourism
    Client
    Aldar
    Country
    UAE
    Status
    Completed, 2007
    Read More 17
  • New Fishing Port

    • NMDC Dredging & Marine
    • Musanada
    Theme
    Seaborne Trade
    Client
    Musanada
    Country
    UAE
    Status
    Completed, 2009 to 2011
    Read More 23
  • New Suez Canal

    • NMDC Dredging & Marine
    • Suez Canal Authority
    Theme
    Seaborne Trade
    Client
    Suez Canal Authority
    Country
    Egypt
    Status
    Completed, 2014 to 2015
    Read More 2
  • Ras Gargoub Port

    • NMDC Dredging & Marine
    • Suez Canal Authority
    Theme
    Seaborne Trade
    Client
    Suez Canal Authority
    Country
    Egypt
    Status
    Completed, 2018 to 2022
    Read More 29
  • Shamal Development Works - Khalifa Port

    • NMDC Dredging & Marine
    • AD Ports Group
    Theme
    Seaborne Trade
    Client
    AD Ports Group
    Country
    UAE
    Status
    Completed, 2022 to 2023
    Read More 8
  • Sir Baniyas Island

    • NMDC Dredging & Marine
    • UAE Presidential Court
    Theme
    Urban Development
    Client
    UAE Presidential Court
    Country
    UAE
    Status
    Ongoing
    Read More 16
  • Dredging Works At Sokhna Ports - Phase II

    • NMDC Dredging & Marine
    • Engineering Authority of Armed Forces
    Theme
    Seaborne Trade
    Client
    Engineering Authority of Armed Forces
    Country
    Egypt
    Status
    Completed, 2010
    Read More 26
  • Swan LNG Project

    • NMDC Dredging & Marine
    • Swan Energy LTD
    Theme
    Energy
    Client
    Swan Energy LTD
    Country
    India
    Status
    Completed, 2016 to 2019
    Read More 28
  • Upper Zakum Field Development

    • NMDC Dredging & Marine
    • ZADCO
    Theme
    Energy
    Client
    ZADCO
    Country
    UAE
    Status
    Completed, 2011 to 2014
    Read More 3
  • Volvo Ocean Race (Marine Works)

    • NMDC Dredging & Marine
    • TDIC
    Theme
    Tourism
    Client
    TDIC
    Country
    UAE
    Status
    Completed, 2011
    Read More 21
  • Yas Island Beach Works

    • NMDC Dredging & Marine
    • Aldar
    Theme
    Tourism
    Client
    Aldar
    Country
    UAE
    Status
    Completed, 2012
    Read More 19
  • Abu Al Abyad Labour Camp (Phase 1)

    • NMDC Infra
    • Department of Presidential Affairs (DOPA)
    Theme
    Integrated Civil & Infrastructure Developments
    Client
    Department of Presidential Affairs (DOPA)
    Country
    UAE
    Status
    Completed
    Read More 11
  • Al Wathba Development

    • NMDC Infra
    • Private Client
    Theme
    EPC, Industrial Civil
    Client
    Private Client
    Country
    UAE
    Status
    Ongoing
    Read More 18
  • Bu Tinah Central Building, Hail & Ghasha Artificial Islands Construction Project

    • NMDC Infra
    • ADNOC
    Theme
    EPC
    Client
    ADNOC
    Country
    UAE
    Status
    Completed
    Read More 14
  • Khalifa Port Etihad Rail Marine Works

    • NMDC Infra
    • Abu Dhabi Ports
    Theme
    Marine
    Client
    Abu Dhabi Ports
    Country
    UAE
    Status
    Completed
    Read More 14
  • Khalifa Port Expansion - South Quay and KP Foreshore Marine Works

    • NMDC Infra
    • Abu Dhabi Ports
    Theme
    Marine
    Client
    Abu Dhabi Ports
    Country
    UAE
    Status
    Completed
    Read More 15
  • Project Shamal Development - Marine Works

    • NMDC Infra
    • Abu Dhabi Ports
    Theme
    Marine
    Client
    Abu Dhabi Ports
    Country
    UAE
    Status
    Completed
    Read More 15
  • Additional 7 Jackets (5 No. for US LTDP-2 Project and 2 No. for LZ EPS-2 Project)

    • NMDC Energy
    • ADNOC
    Theme
    Offshore
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 13
  • Al Yassat Island Development

    • NMDC Infra
    • Department of Presidential Affairs (DOPA)
    Theme
    Integrated Civil & Infrastructure Developments
    Client
    Department of Presidential Affairs (DOPA)
    Country
    UAE
    Status
    Ongoing
    Read More 9
  • Maximizing Ethane Recovery and Monetization (MERAM)

    • NMDC Infra
    • ADNOC
    Theme
    Integrated Civil & Infrastructure Developments
    Client
    ADNOC
    Country
    UAE
    Status
    Ongoing
    Read More 3
  • LULU Bridge Construction

    • NMDC Infra
    • Eagle Hills
    Theme
    Bridges
    Client
    Eagle Hills
    Country
    UAE
    Status
    Ongoing
    Read More 2
  • Umm Yafina - Phase 2

    • NMDC Infra
    • Ministry of Presidential Affairs (MOPA)
    Theme
    Water Generation, Treatment & Desalination Projects
    Client
    Ministry of Presidential Affairs (MOPA)
    Country
    UAE
    Status
    Ongoing
    Read More 10
  • Fujairah Desalination Plant

    • NMDC Infra
    • ETIHADWE
    Theme
    EPC
    Client
    ETIHADWE
    Country
    UAE
    Status
    Ongoing
    Read More 1
  • ADWEA Labour Camp

    • NMDC Infra
    • ADNOC
    Theme
    EPC
    Client
    ADNOC
    Country
    UAE
    Status
    Completed
    Read More 13
  • Hudayriyat Floating Bridge Piling Work

    • NMDC Infra
    • MODON
    Theme
    Enabling Works / Piling / Ground Improvement
    Client
    MODON
    Country
    UAE
    Status
    Completed
    Read More 6
  • Construction Works for Emergency Lagoon for Abu Dhabi Region

    • NMDC Infra
    • Abu Dhabi Sustainable Water Solutions Company
    Theme
    Integrated Civil & Infrastructure Developments
    Client
    Abu Dhabi Sustainable Water Solutions Company
    Country
    UAE
    Status
    Ongoing
    Read More 5
  • Al Naseem Residential Development

    • NMDC Infra
    • Fibrex Construction
    Theme
    Precast & Specialized Construction
    Client
    Fibrex Construction
    Country
    UAE
    Status
    Ongoing
    Read More 8
  • Hail & Gasha Artificial Islands

    • NMDC Infra
    • NMDC
    Theme
    Enabling Works / Piling / Ground Improvement, Precast & Specialized Construction
    Client
    NMDC
    Country
    UAE
    Status
    Completed
    Read More 7
  • Emirates National School

    • NMDC Infra
    • NMDC
    Theme
    Precast & Specialized Construction
    Client
    NMDC
    Country
    UAE
    Status
    Completed
    Read More 12
  • Restoration and Rehabilitation of STEP Terminal Pumping Station – PS01 (DBO)

    • NMDC Infra
    • TAQA WS
    Theme
    Power & Utilities
    Client
    TAQA WS
    Country
    UAE
    Status
    Completed
    Read More 4

Latest News

  • NMDC Group Expands Fleet with Inauguration of State-of-the-Art ‘Abu Al Bakhoush’ Dredger

    • NMDC Dredging & Marine
    • Oct 2026
  • Robust Second Quarter Reinforces H1 2026 Financial Performance, with Revenue Reaching AED 14.1 Billion and Net Profit of AED 1.6 Billion

    • NMDC Group
    • Jul 2026

Read More News